- Before the game (opening Face-Off -75 minutes)
- The overhead cameras and the fixed cameras, if used, must be switched on first.
- After the cameras, the video technology of the Sportlounge-Box is to be activated (upper toggle switch on the front of the box).
- Next, start the control tablet for the cameras.
- Once these steps are completed, the setup of the VGJ and Scoreboard Connect system can begin
- The overhead cameras and the fixed cameras, if used, must be switched on first.
- After the game (once all players have left the ice)
All under (1) activated components must be de-activated and the VGJ-System can be dismantled.
§ 9 Schedule Game Center
- Parent Category: ICE Hockey League
- Category: M | Game Center