1. Provision of Electricity
    The arena operator agrees to set up a sufficient power supply for all technical vehicles of the ICE Hockey League Live TV Partners or its commissioned service providers in the immediate vicinity of the technical shelves and sufficient power for the studio in the immediate vicinity of the studio.

    The costs for the installation of the connections as well as the power consumption are borne by the arena operator / organizer. If the arena operator does not have sufficient power supply with the required protection available, a generator will be ordered at the expense of the arena operator / organizer.

  2. Needed Electricity
    Power requirements for a standard HD transmission:

    • 1x 125A / CEE (OB van) with protection of C63 or D63
    • 1x 63A / CEE (equipment truck) with protection of C63 or D63
    • 2x 16A / CEE (IP / SNG van) with protection of C63 or D63
    • 1x 16A / CEE (graphic van) with protection of C63 or D63
    • 3x 230V / CEE (Studio)
    • 3x 230V / CEE (production office)
    • 2x 230V / CEE (1x each in the changing rooms of the teams, position chip cameras)
    • 3x 230V/Schuko for scouter
    • 6x 230V/Schuko for commentary position

      For dual productions (Play-Offs)

    • 1x 32 A / CEE SNG / Schuko commentator / field position
  3. Power supply
    It must be ensured that each phase intended for TV production is protected with its own RCD switch.